Crane installation for company Holcim Ltd.
For the investor, company Holcim Ltd., we designed, manufactured, installed, tested and put into operation a monorail crane that was installed in the company's production plant. The monorail crane has a load capacity of 2,5 t, the length of the monorail track is 12 m, which is curved in one part in the amount of 55 °, while the lifting height is 7,085 m.
TECHNICAL CHARACTERISTICS:
- capacity: 2,5 t
- lenght of monorail track: 12 m
- max. lifting height: 7,085 m
- lifting speed (frequency reg.): 6,6 - 1,1 m/min
- hoist travel speed (frequency reg.): 24 - 2,4 m/min
- max. span of suspension points of monorail track: 6,92 m
Monorail crane MD 2,5 t / 12 m, H=7,085 m with curved crane track was made on a "turnkey basis" and you can read all additional information about the crane here.